this post was submitted on 29 Apr 2025
38 points (100.0% liked)

Hardware

2050 readers
288 users here now

All things related to technology hardware, with a focus on computing hardware.


Rules (Click to Expand):

  1. Follow the Lemmy.world Rules - https://mastodon.world/about

  2. Be kind. No bullying, harassment, racism, sexism etc. against other users.

  3. No Spam, illegal content, or NSFW content.

  4. Please stay on topic, adjacent topics (e.g. software) are fine if they are strongly relevant to technology hardware. Another example would be business news for hardware-focused companies.

  5. Please try and post original sources when possible (as opposed to summaries).

  6. If posting an archived version of the article, please include a URL link to the original article in the body of the post.


Some other hardware communities across Lemmy:

Icon by "icon lauk" under CC BY 3.0

founded 2 years ago
MODERATORS
 
top 3 comments
sorted by: hot top controversial new old
[–] [email protected] 5 points 2 weeks ago (1 children)

Completely mind boggling what's going on there. The amount of work to be put in to fix all this is enormous. I truly wish everyone involved nerves of steel and the best of luck.

[–] [email protected] 8 points 2 weeks ago (1 children)

The reporting seems a bit slow, as of right now the restart of the electric grid has been successfully completed without any major hiccups.

[–] [email protected] 7 points 2 weeks ago

Regardless of how precisely the grid operators manage to handle this task in Spain and Portugal, they face a monumental challenge at the moment. If you're seeing estimates of several days for the restoration of power, it's because failing to meet this challenge will leave things back in the state they're in now.

I was much less impressed by the 24 hr turnaround before I saw this guy posting this halfway through the process in what seems like full confidence he had plenty of time to get it out in a relevant timeframe.

Good job Iberian operators, I guess?